Previous revision
Approved baseline / earlier export
Select the flat BOM table. Formulas need saved results; Excel errors are rejected.
Two versions of your bill of materials. One precise change report. Catch additions, quantity shifts, part revisions, spec edits and cost movement before a release.
Use flat BOM exports with a header row. Matching is based on part numbers, not row order.
Approved baseline / earlier export
Select the flat BOM table. Formulas need saved results; Excel errors are rejected.
Proposed release / most recent export
Select the flat BOM table. Formulas need saved results; Excel errors are rejected.
Confirm what each source column means. Only fields present on both sides are compared.
Your parts, quantities and field-level changes appear here after comparison.
Import or try the included pair of BOMs, check the mapped columns, and run a comparison. You’ll get an inspectable change register and CSV report.
Use exports from the same assembly and variant. Record the actual approved baseline and proposed revision; filenames alone do not establish release status.
The tool compares supplied quantities as entered; it does not normalize units, expand nested subassemblies, interpret alternate parts or convert per-board quantities into production orders.
Extended cost is quantity × the entered unit cost, rounded to cents per part. It is not a live quote or purchasing forecast; mixed currencies and pack bases must be resolved before use.
Standard Excel .xlsx workbooks and UTF-8 comma-, semicolon- or tab-delimited CSV/TSV/text files. For Excel, choose a worksheet and its header row (1–50). Up to 5 MB per file, 10,000 data rows and 80 columns. Formatted part IDs retain leading zeros; numeric quantity/cost cells use their stored values. Formulas use saved results and are never calculated here. Recalculate and save in Excel first. Merged table cells, Excel errors, encrypted files, .xls/.xlsm, PDF, CAD files and nested assemblies are not supported.
The comparison rejects duplicates by default, with source row numbers. Optional aggregation adds quantities only when the duplicate lines agree on their mapped revision, description, unit, manufacturer and cost. No mismatched rows are merged.
If cost columns exist on both sides, unit costs and extended cost changes can be compared. Missing costs prevent the full total estimate. Part numbers and decimal values are treated as text and precise decimal quantities, respectively; currency conversion is not attempted.
No. The report identifies differences within the uploaded tables. A responsible ECO review still verifies drawing revisions, component equivalence, configuration, regulatory requirements, routing and release approval.